Every order comes with FAST, FREE Shipping, plus a FREE 365-Day Return Policy!
Japan Best Long Lead Pencil Sharpener
Japan Best Long Lead Pencil Sharpener
Japan Best Long Lead Pencil Sharpener
Japan Best Long Lead Pencil Sharpener

Japan Best Long Lead Pencil Sharpener

Free worldwide shipping, tax free!

$24.00 $51.00

Main Features & Information

Japan Best Long Lead Pencil Sharpener
  • Can sharpen pencils to an extremely sharp point
  • Ultimate Premium Sharpener
  • The blade is made by one craftsman

The preferred sharpener of pencil enthusiasts, similar to an electric pencil sharpener.

A Long-lasting Pencil Sharpener. This pencil sharpener is made using recyclable aluminium, and its sharpening unit part is replaceable. Designed to be easily held and to facilitate enjoyable sharpening. A minimalistic design to encourage a prolonged affection for the act of sharpening. We hope you find joy in using it for an extended period.

Size: 3.8 x 2.6 x 1.7 (㎝) Weight 7.0 (g)

Made in Japan